Posted: Sun May 13, 07 9:16 am Post subject: |
|
Quote: |
I'll be interested to hear how it goes - although I half expected that you would have built it by now. |
Us too !
Since we started the foundations for the stove, we've had to stop to do so many other things including rehabilitating Fabrice's uncle's house for wheelchair access. We've opened a metre thick wall through to make a doorway, insulated and raised a floor, put ramps in etc. and for the past two months we're with him four times a day... (but all that's another story.)
We're also building the extension ourselves, cutting the wood for the beams from our land, choosing, cutting, moving, shaping and cleaning them takes up a lot of time. Also, we decided to use bottles (instead of straw which we used for the original part of the house) for the floor insulation and we just aren't emptying them fast enough...
|
|
|
|
|
MarkS
Joined: 01 Aug 2006 Posts: 2626
|
|
|
|
|
|